Installing a Smart Storage Battery in the 10 SFF SAS/SATA/NVMe Combo
backplane configuration
Prerequisites
The Smart Storage Battery must be installed in this orientation when the 10 SFF SAS/SATA/NVMe Combo
backplane is installed.
Procedure
1.
Power down the server (
on page 24).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
a.
Extend the server from the rack (
Extend the server from the rack
on page 24).
b.
Remove the server from the rack (
Remove the server from the rack
4.
5.
Remove the right retainer. Set aside.
6.
Slide the battery into the left retainer, and then install the right retainer.
106
Installing a Smart Storage Battery in the 10 SFF SAS/SATA/NVMe Combo backplane configuration