a.
Extend the server from the rack (
Extend the server from the rack
on page 24).
b.
Remove the server from the rack (
Remove the server from the rack
4.
5.
Using a Torx T-10 screwdriver, remove the 4 LFF display port/USB blank.
6.
Install the 4 LFF display port/USB module.
7.
Route and connect the cable.
Hardware options installation
99