13.
Install the access panel (
on page 25).
14.
Install the server in the rack.
15.
Connect each power cord to the server.
16.
Connect each power cord to the power source.
17.
Power up the server (
on page 24).
Controller options
Installing an HPE Smart Array P408i-a Controller option
Prerequisites
Before installing this option, be sure that you have the following:
• The components included with the hardware option kit
• T-15 Torx screwdriver
Procedure
1.
Observe the following alerts:
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
CAUTION:
To prevent damage to electrical components, properly ground the server before beginning any
installation procedure. Improper grounding can cause electrostatic discharge.
2.
Back up all server data.
3.
Power down the server (
on page 24).
4.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
5.
Do one of the following:
82
Controller options