Hardware options installation 44
9.
If you are installing the optical drive in an SFF drive model, connect the optical drive cable to the optical
drive.
10.
Route the optical drive cable along the side of the system board, and then connect the cable to the
system board:
o
Four-bay LFF drive model
o
Eight-bay SFF drive model
11.
Install the PCI riser cage (on page
21
).
12.
Install the access panel (on page
20
).
13.
Install the server into the rack ("
Installing the server into the rack
" on page
27
).
14.
Power up the server (on page
17
).
Hot-plug fan module option
To provide sufficient airflow to the system if a fan rotor fails, the server supports redundant fans.