Hardware options installation 55
1.
Determine the status of the hard drive from the hot-plug SAS hard drive LED combinations ("
SAS and
SATA hard drive LED combinations
" on page
17
).
2.
Back up all server data on the hard drive.
3.
Remove the hard drive.
Eight-bay SFF drive cage option
Install the optional eight-bay SFF drive cage in drive cage bay 2 or drive cage bay 3.
To install an additional eight-bay SFF drive cage, an optional SAS controller is required. To obtain the
option, contact an HP authorized reseller.
To configure this option for drive cage bay 3, locate the three jumper pins on the backplane. Move the
jumper from pins 1 and 2 to pins 2 and 3.
For more information, see "Drive cage jumper configuration settings (on page
21
)."
Installing the eight-bay SFF drive cage (bay 2)
1.
Power down the server (on page
22
).
2.
Do one of the following:
o
Open or remove the tower bezel, as needed ("
Open or remove the tower bezel
" on page
22
).
o
Extend the server from the rack (on page
24
).
3.
Remove the access panel (on page
25
).
4.
Remove the air baffle (on page
26
).
5.
Remove the fan cage (on page
26
).
6.
Remove the hard drive cage blank (on page
28
).
7.
Using a T-10 Torx screwdriver, remove the two screws on top of the drive cage.
Summary of Contents for ProLiant DL370
Page 1: ...HP ProLiant DL ML370 G6 Server User Guide Part Number 513482 001 March 2009 First Edition ...
Page 16: ...Component identification 16 SFF hard drives LFF hard drives ...
Page 29: ...Operations 29 6 Remove the hard drive cage blank ...
Page 94: ...Cabling 94 Drive cage bay 2 Drive cage bay 3 ...
Page 95: ...Cabling 95 Six bay LFF backplane cabling Drive cage bay 1 Drive cage bay 2 ...
Page 97: ...Cabling 97 Battery cabling for BBWC DVD ROM drive cabling ...
Page 98: ...Cabling 98 Slimline optical drive cabling ...
Page 123: ...Troubleshooting 123 ...
Page 146: ...Technical support 146 ...
Page 147: ...Technical support 147 ...