Hardware options installation 72
7.
Slide the optical drive into the drive bay.
8.
Route and connect the cables:
a.
Connect the power and data cable to the optical drive.
b.
Connect the power cable to an available system power cable
c.
Route and connect the data cable to the system board.
9.
Install the fan cage.
10.
Install the air baffle.
11.
Install the access panel.
12.
Do one of the following:
o
Close or install the tower bezel, as needed.
o
Slide the server back into the rack.
13.
Power up the server (on page
22
).
Summary of Contents for ProLiant DL370
Page 1: ...HP ProLiant DL ML370 G6 Server User Guide Part Number 513482 001 March 2009 First Edition ...
Page 16: ...Component identification 16 SFF hard drives LFF hard drives ...
Page 29: ...Operations 29 6 Remove the hard drive cage blank ...
Page 94: ...Cabling 94 Drive cage bay 2 Drive cage bay 3 ...
Page 95: ...Cabling 95 Six bay LFF backplane cabling Drive cage bay 1 Drive cage bay 2 ...
Page 97: ...Cabling 97 Battery cabling for BBWC DVD ROM drive cabling ...
Page 98: ...Cabling 98 Slimline optical drive cabling ...
Page 123: ...Troubleshooting 123 ...
Page 146: ...Technical support 146 ...
Page 147: ...Technical support 147 ...