The tower-to-rack conversion kit includes:
•
Rack-mounting hardware kit
•
Rack bezel
•
Front video connector cable
•
T-15 screws (6)
•
Screwlocks (2)
•
This document
In addition to the items supplied in the conversion kit, you will also need the following items:
•
A Torx T-15 screwdriver (clipped to the rear panel of the server)
•
A 3/16-in nut driver
To convert a tower model server to a rack model server:
1.
Power down the server (on page
22
).
2.
Disconnect all rear panel cabling.
3.
Remove the feet.
4.
Remove the tower bezel ("
Open or remove the tower bezel
" on page
22
).
5.
Remove the access panel (on page
25
).
6.
Remove the air baffle (on page
26
).
7.
Remove the fan cage (on page
26
).
8.
Remove all SFF hard drives ("
Removing a hot-plug SAS hard drive
" on page
54
).
9.
Disconnect all cables from the drive cages.
10.
Remove the SFF drive cages.
For more information, see the server maintenance and service guide.
11.
Remove the hard drive cage blank (on page
28
).
12.
Remove the DVD-ROM drive (on page
28
), if installed.
13.
Remove the two-bay LFF drive cage, if installed.
Summary of Contents for ProLiant DL370
Page 1: ...HP ProLiant DL ML370 G6 Server User Guide Part Number 513482 001 March 2009 First Edition ...
Page 16: ...Component identification 16 SFF hard drives LFF hard drives ...
Page 29: ...Operations 29 6 Remove the hard drive cage blank ...
Page 94: ...Cabling 94 Drive cage bay 2 Drive cage bay 3 ...
Page 95: ...Cabling 95 Six bay LFF backplane cabling Drive cage bay 1 Drive cage bay 2 ...
Page 97: ...Cabling 97 Battery cabling for BBWC DVD ROM drive cabling ...
Page 98: ...Cabling 98 Slimline optical drive cabling ...
Page 123: ...Troubleshooting 123 ...
Page 146: ...Technical support 146 ...
Page 147: ...Technical support 147 ...