Setup and Installation in a Rack
9.
Align the storage system with the rails and slide it into the rack.
WARNING: The storage system weight, as assembled for shipping, exceeds
22.7 kg (50 lb). To reduce the risk of personal injury or damage to the
equipment, at least two people are required to lift the storage system during
removal or installation. Install the storage system in the lowest available
position in the rack.
WARNING: Always use at least two people to lift an enclosure into the rack. If
the enclosure is being loaded into the rack above chest level, a third person
must assist with aligning the enclosure with the rails while the other two
people support the weight of the enclosure.
CAUTION:
To prevent storage system damage and ease insertion, support the
weight of the storage system and keep it level when sliding the storage system into
the rack.
HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide
5-9
HP CONFIDENTIAL
Writer: Woody Jernigan File Name: f-ch5 Setup and Installation in a Rack
Codename: Sopwith Part Number: 252621-003 Last Saved On: 9/17/03 1:02 PM