Setup and Installation in a Rack
10.
Secure the storage system to the rack.
IMPORTANT:
Tightening of the shipping bracket is only necessary if the rack is to be shipped
with the MSA500 system installed.
5-10
HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide
HP CONFIDENTIAL
Writer: Woody Jernigan File Name: f-ch5 Setup and Installation in a Rack
Codename: Sopwith Part Number: 252621-003 Last Saved On: 9/17/03 1:02 PM