Setup and Installation in a Rack
Powering On and Configuring the Packaged Cluster
1.
Power on the storage system and wait for the controllers to initialize.
IMPORTANT:
You must power on the MSA500 system before powering on the servers.
After powering on, wait until the storage system startup complete message displays. It
might take up to two minutes for the system to completely power up.
2.
Power on one server.
IMPORTANT:
Do not use the Option ROM Configuration for Arrays (ORCA) utility to
configure the MSA500 system. The Array Configuration Utility must be used.
IMPORTANT:
If your system was previously configured, power on the second server.
The installation process is complete.
While the server boots, the ROM-Based Setup Utility (RBSU) and the ORCA
utility are automatically configured to prepare the server for the operating system
installation. To configure these utilities manually:
— Press
the
F8
key when prompted during the array controller initialization to
configure the array controller using ORCA. The array controller defaults to
RAID 0 with one drive installed and RAID 1 with more than one drive
installed.
— Press
the
F9
key when prompted during the boot process to change the
server settings, such as the settings for language and operating system, using
RBSU. The system is set up by default for the English language and a
Microsoft® Windows® 2000 installation.
For more information on the automatic configuration, refer to the
HP ROM-
Based Setup Utility User Guide
located on the Documentation CD.
HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide
5-21
HP CONFIDENTIAL
Writer: Woody Jernigan File Name: f-ch5 Setup and Installation in a Rack