Hardware options installation 69
5.
Attach the ground (earthed) wire to the ground screw and washer and tighten to 1.47 N m (13 lb-in) of
torque. The ground wire must be connected before the positive or negative lead wires.
6.
Attach the power ring tongues to the terminal block, following the polarity label below the terminal
block, and then tighten the screws to 1.47 N m (13 lb-in) of torque.
Summary of Contents for ProLiant DL380p Gen8
Page 6: ...Contents 6 Index 131 ...
Page 47: ...Hardware options installation 47 14 Install the heatsink 15 Remove the two fan blanks ...
Page 92: ...Cabling 92 LFF hard drive cabling Optical drive cabling ...
Page 93: ...Cabling 93 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Page 98: ...Cabling 98 Connect the cable as indicated ...
Page 125: ...Support and other resources 125 ...
Page 126: ...Support and other resources 126 ...