• Extend the server from the rack (
Extend the server from the rack
on page 38).
• Remove the server from the rack (
Removing the server from the rack
4.
on page 40).
5.
If installed, do the following:
a.
Remove the air baffle (
on page 42).
b.
Remove the processor mezzanine tray (
Removing the processor mezzanine tray
on page 47).
c.
Remove the 2P pass-through performance board (
Removing the 2P pass-through performance
on page 48).
6.
on page 46).
7.
Remove the screws, and then remove the drive bay blank.
8.
Install the drive cage.
9.
Route and connect the cables depending on the server configuration. For more information, see
"
on page 109."
To cable the drive cage to the HPE 12G SAS Expander, see "
Installing the HPE 12G SAS Expander
on page 96."
10.
Install the fan cage.
11.
If removed, do the following:
52