a.
Install the air baffle (
on page 43).
b.
Install the processor mezzanine tray (
Installing a processor mezzanine tray
c.
Install the 2P pass-through performance board (
Installing a 2P pass-through performance board
on page 88).
12.
Install the access panel (
on page 41).
13.
Install the server into the rack (
Installing the server into the rack
14.
Connect each power cord to the server.
15.
Connect each power cord to the power source.
16.
Power up the server (
on page 38).
Installing an eight-bay NVME SSD drive cage
The eight-bay NVME SSD drive cage can only be installed in drive box 2 in the front of the server. See "
Prerequisites
Before installing this option, be sure that you have the following:
• T-10 Torx screwdriver
• The components included with the hardware option kit
Procedure
1.
on page 38).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
• Extend the server from the rack (
Extend the server from the rack
on page 38).
• Remove the server from the rack (
Removing the server from the rack
on page 39).
4.
on page 38).
5.
on page 40).
6.
If installed, do the following:
a.
Remove the air baffle (
b.
Remove the processor mezzanine tray (
Removing the processor mezzanine tray
on page 47).
c.
Remove the 2P pass-through performance board (
Removing the 2P pass-through performance
on page 48).
7.
on page 46).
8.
Remove the screws, and then remove the drive bay blank.
Installing an eight-bay NVME SSD drive cage