Removal and Replacement Procedures
Powering Down the Server
WARNING: It is necessary to be knowledgeable of electrostatic discharge information
before preparing the server. For electrostatic discharge information, refer to
“Electrostatic Discharge Information” in this chapter.
To power down the server:
1. Remove the front bezel door (tower model only). Refer to “Removing the Front Bezel
Door (Tower Model Only)” in this chapter.
2. Press the Power On/Standby button.
Figure 2-25: Pressing the Power On/Standby button
3. Be sure that the front panel power LED indicator is amber and that the fans are off.
4. Disconnect all AC power cords from the server.
5. Disconnect all external peripheral devices from the server.
HP ProLiant ML570 Generation 2 Server Maintenance and Service Guide
2-37
Summary of Contents for ProLiant ML570 Generation 2
Page 6: ......