Installing components 22
2.
To secure the bracket to the rack column, fasten the screws.
To install the 4U chassis:
1.
Insert the chassis into the rails.
2.
Align the two holes on the chassis with the holes on the bracket, and then to secure the chassis to the
bracket, fasten the screws.
To install the shipping bracket:
1.
Install two cage nuts on the back of both rear rack columns (four cage nuts total) in the desired U space.
2.
Install the shipping bracket to the rack column.
Summary of Contents for ProLiant s6500
Page 36: ...Cabling 36 ...