Installation 46
3.
Connect the CAN bus communication cable from the DB-15 connector on the UPS to the DB-15
connector on the battery pack.
4.
Switch the circuit breaker on the battery pack right to the On position.
To install a second battery pack that is the same battery type and rack U height:
1.
Verify that the circuit breaker on the battery pack is in the left, Off position.
2.
Connect the DC to DC power cable from the first battery pack connector to the second battery pack
connector.
Up to two packs can be connected to the UPS.
3.
Connect the CAN bus communication cable from the first battery pack to the second battery pack.
Summary of Contents for R12000 XR
Page 17: ...Overview 17 o Two 3U DirectFlow Battery Packs o Two 1U DirectFlow Battery Packs ...
Page 98: ...Troubleshooting 98 ...
Page 99: ...Troubleshooting 99 ...
Page 100: ...Troubleshooting 100 ...
Page 101: ...Troubleshooting 101 ...
Page 102: ...Troubleshooting 102 ...
Page 103: ...Troubleshooting 103 ...
Page 104: ...Troubleshooting 104 ...
Page 105: ...Troubleshooting 105 ...
Page 106: ...Troubleshooting 106 ...
Page 107: ...Troubleshooting 107 ...
Page 108: ...Troubleshooting 108 ...
Page 109: ...Troubleshooting 109 ...
Page 110: ...Troubleshooting 110 ...
Page 111: ...Troubleshooting 111 ...