4 Storage Configuration
This section describes how to configure the storage after the nodes have been configured.
Establishing Communication Between the VLS12000 Gateway
and the EVA
Verifying Array Zoning
Verify that you have configured the zoning between the EVA ports and all storage ports on all the
nodes of your VLS Gateway. For example, storage ports 2 and 3 on each node should connect to
different SAN zones/fabrics; EVA controllers should also be connected to both zones/fabrics. If you
have not done so, refer to the
HP StorageWorks VLS and D2D Solutions Guide
to do so now.
Presenting the LUNs
NOTE:
If you have noted the list of WWPNs while performing the multi-node setup (see
“
Configuring the Secondary Nodes 1 through 7
” on page 33), go directly to step 2 of the procedure
below.
HP StorageWorks
35
Summary of Contents for StorageWorks 12000
Page 14: ...14 ...
Page 102: ...Operation 102 ...
Page 110: ...User Interfaces 110 ...
Page 150: ...Management 150 ...
Page 168: ...Monitoring 168 ...
Page 198: ...Component Identification 198 ...
Page 222: ...Support and Other Resources 222 ...
Page 232: ...Troubleshooting 232 ...
Page 236: ...Specifications 236 ...
Page 244: ...Bulgarian Notice Czech Notice Danish Notice Dutch Notice Regulatory Compliance Notices 244 ...
Page 245: ...Estonian Notice Finnish Notice French Notice German Notice HP StorageWorks 245 ...
Page 246: ...Greek Notice Hungarian Notice Italian Notice Latvian Notice Regulatory Compliance Notices 246 ...
Page 247: ...Lithuanian Notice Polish Notice Portuguese Notice Romanian Notice HP StorageWorks 247 ...
Page 249: ...Battery Replacement Notices Dutch Battery Notice HP StorageWorks 249 ...
Page 250: ...French Battery Notice German Battery Notice Regulatory Compliance Notices 250 ...
Page 251: ...Italian Battery Notice Japanese Battery Notice HP StorageWorks 251 ...
Page 252: ...Spanish Battery Notice Regulatory Compliance Notices 252 ...