Installing the SAN Switch 2/16
41
hp StorageWorks SAN Switch 2/16 Installation Guide
4. Install two M5 U-type Tinnerman clips for each of the front columns of the
rack in the top and bottom positions of the three-hole pattern as shown in
Figure 9
.
Figure 9: Installing the tinnerman clips
5. Assemble the outer rails by completing the following steps:
a.
As an aid in assembly, two rubber washers have been included to help
keep the rear slotted portion of the outer rail flush against the rear rail-tray
brackets. Install them as shown in
Figure 10
.
Summary of Contents for StorageWorks 2/16 - SAN Switch
Page 8: ...Contents 8 hp StorageWorks SAN Switch 2 16 Installation Guide ...
Page 60: ...Installing the SAN Switch 2 16 60 hp StorageWorks SAN Switch 2 16 Installation Guide ...
Page 74: ...Managing the SAN Switch 2 16 74 hp StorageWorks SAN Switch 2 16 Installation Guide ...
Page 86: ...Regulatory Compliance Notices 86 hp StorageWorks SAN Switch 2 16 Installation Guide ...
Page 94: ...Technical Specifications 94 hp StorageWorks SAN Switch 2 16 Installation Guide ...
Page 111: ......
Page 112: ......