Installing and configuring the switch
30
Two jumper cables (C19-C20) are provided to connect from the switch to the PDU. The
recommended power cords to connect from the PDU to the wall are E7803A, E7805A,
E7806A, E7808A, and E7809A.
Installing the switch as a stand-alone unit
The following items are required for this setup:
•
Core Switch 2/64 or SAN Director 2/128
•
AC power cords and cables supplied with the switch
Removing the chassis door
CAUTION:
You must remove the chassis door before lifting the chassis off the pallet.
(See
Figure 4
for an illustration of the complete chassis door removal sequence.)
1.
Open the door to a 90
°
angle.
2.
Push the spring-loaded lever on the upper hinge up and into the notch in the hinge.
3.
Push the spring-loaded lever on the lower hinge down and into the notch in the hinge, while
supporting the door to prevent it from falling.
Figure 4
Sequence for detaching the chassis door from the hinges
1
2
3
SHR-2508A
Summary of Contents for StorageWorks 2/64 - Core Switch
Page 8: ...Contents 8 ...
Page 24: ...Overview 24 ...
Page 130: ...Setting up and installing modems 130 ...
Page 134: ...Running routine operations 134 ...
Page 166: ...Index 166 ...