Installation and Configuration
27
SSL1016 Tape Autoloader Reference Guide
To rackmount the autoloader:
1. Use the template that shipped with the library to mark the location of the clip
nuts and mounting hardware on the mounting rails of the rack.
Figure 6: Measuring with the rack template
2. Install two clip nuts into each front rail of the rack in the hole locations
marked using the template.
3. Install two clip nuts into each back rail of the rack in the hole locations
marked using the template.
4. If there are no devices installed below the autoloader, use the optional
installation rails to help support the autoloader during installation:
a.
Install four clip nuts at the front of the rack, two on each rail. Install the
first clip nuts two holes below the bottom autoloader clip nut. Install the
second clips nuts two holes below the first clip nuts.
b.
Insert one optional mounting rail into the rack with the support ledge
facing in.
Summary of Contents for StorageWorks SSL1016
Page 8: ...Contents 8 SSL1016 Tape Autoloader Reference Guide ...
Page 14: ...About this Guide 14 SSL1016 Tape Autoloader Reference Guide ...
Page 22: ...Overview 22 SSL1016 Tape Autoloader Reference Guide ...
Page 60: ...Installation and Configuration 60 SSL1016 Tape Autoloader Reference Guide ...
Page 118: ...Autoloader Operation 118 SSL1016 Tape Autoloader Reference Guide ...
Page 126: ...Tape Drive Cleaning 126 SSL1016 Tape Autoloader Reference Guide ...
Page 143: ...Regulatory Compliance Notices 143 SSL1016 Tape Autoloader Reference Guide Japanese Notice ...
Page 144: ...Regulatory Compliance Notices 144 SSL1016 Tape Autoloader Reference Guide ...
Page 156: ...Upgrading or Replacing the DCA 156 SSL1016 Tape Autoloader Reference Guide ...
Page 160: ...Index 160 SSL1016 Tape Autoloader Reference Guide ...