IMPORTANT:
When the server is in standby mode, auxiliary power is still being provided to the system.
To power down the server, use one of the following methods:
• Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters
standby mode.
• Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter
standby mode.
This method forces the server to enter standby mode without properly exiting applications and the OS.
If an application stops responding, you can use this method to force a shutdown.
• Use a virtual power button selection through iLO.
This method initiates a controlled remote shutdown of applications and the OS before the server
enters standby mode.
Before proceeding, verify that the server is in standby mode by observing that the system power LED is
amber.
Remove the server from the rack
WARNING:
This server is heavy. To reduce the risk of personal injury or damage to the equipment:
• Observe local occupational health and safety requirements and guidelines for manual material
handling.
• Get help to lift and stabilize the product during installation or removal, especially when the
product is not fastened to the rails. Hewlett Packard Enterprise recommends that a minimum of
two people are required for all rack server installations. A third person may be required to help
align the server if the server is installed higher than chest level.
• Use caution when installing the server in or removing the server from the rack; it is unstable
when not fastened to the rails.
Prerequisites
Before you perform this procedure, make sure that you have T-15 Torx screwdriver available.
Procedure
on page 25.
2.
Fully extend the server out of the rack.
26
Remove the server from the rack
Summary of Contents for ProLiant ML110 Gen10
Page 12: ...12 Customer self repair ...
Page 13: ...Customer self repair 13 ...
Page 14: ...14 Customer self repair ...
Page 15: ...Customer self repair 15 ...
Page 85: ...Smart Storage Battery cabling Smart Storage Battery cabling 85 ...
Page 86: ...Serial port cabling Front I O cabling 86 Serial port cabling ...
Page 87: ...Front USB 3 0 cabling iLO service port cabling Front USB 3 0 cabling 87 ...