2.

 

  Controller Operation Instructions 

 

a)

 

Step 2: Connect the battery. If the connection is correct, the controller screen lights up; otherwise, check whether the 

          connection is correct. 

b)

 

Step 3: Connect the solar panel. If sunlight is present and strong enough (the solar panel voltage is greater than battery 

          voltage), the sun icon on the LCD screen is on; otherwise, check whether the connection is correct. 

c)

 

Step 4: Connect the load. Connect the load leads to the controller's load output terminal, and the current shall not exceed 

          the controller's rated current. 

3.

 

As the controller generates heat during operation, it is recommended that the controller be installed in 

an environment with good ventilation conditions.   

4.

 

Choose cables with large enough capacity for connection, in case too much loss incurred on the lines 

causes the controller to misjudge. 

5.

 

The controller has a common positive pole inside. If grounding is needed, ground the positive pole. 

6.

 

It's  important  to  fully  charge  the  battery  regularly.  At  least  once  full  charging  every  month  is 

recommended, and failure to do that may cause permanent damage to the battery. Only when in-flow 
energy outpaces out-flow energy can the battery be charged fully. Users shall bear this in mind when 
configuring the system. 

7.

 

Check  whether  the  controller's  each  connection  terminal  is  tightened  securely;  if  not,  it  may  suffer 

damage when there is excessive current. 

 
 

State Indicators 

 

LCD Icon 

Indicated Object 

State 

 
 

Daytime or 

charging 

Steady on 

Night recognition 

Steady off 

 

Load short circuit or 
overload 

Quick flashing 

  Load switched on 

Steady on 

Load switched off 

Steady off 

 

Normal battery 

All on 

Over discharge 

Only  the  outline 
flashes 

Overvoltage 

3 dashes 

flashing 

 

Summary of Contents for HQST-KIT-STCS100D-10A

Page 1: ...1 HQST 100W Monocrystalline Solar Suitcase User Manual...

Page 2: ...on employed charging parameters can be automatically adjusted 7 A wide range of load working modes facilitate the product s application to different types of load 8 The product provides overcharge ove...

Page 3: ...3 Solar Panel Structure Installation Instructions and Precautions 1 Unfold panel and lock butterfly washer when tilt angle desired Tilt Stand Handle Aluminum Frame...

Page 4: ...r connection in case too much loss incurred on the lines causes the controller to misjudge 5 The controller has a common positive pole inside If grounding is needed ground the positive pole 6 It s imp...

Page 5: ...ly Five load Working Modes 1 Pure light control 0 When sunlight disappears and the light intensity drops to the starting point the controller initiates a one minute delay settable to confirm the start...

Page 6: ...ion during installation and debugging 5 Normal on 17 The energized load keeps in output state LED Display Mode 00 Pure light control mode 01 14 Light control time control 1 to 14 hours 15 Manual mode...

Page 7: ...ltage is too high The battery icon flashes slowly and there is no output The battery is over discharged and will recover after recharged adequately The load icon flashes quickly and there is no output...

Page 8: ...ver discharge recovery voltage 12 6V 2 24V Over discharge voltage 11 1V 2 24V Equalizing charging interval 30days Equalizing charging time 1H Boost charging time 2H Temperature compensation 3 0mV 2V L...

Reviews: