- 9 -
IV. Repairing procedure in case of failure of connection
1) Turn over the connector main body which has been failed in connection.
2) Insert pulling tool
④
between connector main body
①
and lock section (4 places)
③
of ground plate
②
and
remove the click.
Pulling tool : DF-C-PO (B) (Optional)
3) Press down the ground plate to open it.
4) Press FPC
⑤
and ground plate
②
by fingers and pull out connector main body
①
.
5) Remove ground plate
②
from the FPC
⑤
.
Ground plate
②
FPC
⑤
Connector
main body
①
Pulling tool : DF-C-PO (B)
Optional
④
FPC
⑤
Ground plate
②
Pull out
Lock section
③
(4 places right/left)
1. Do not perform re-connection of the connector main body and ground plate for which repair has
been performed. Scrap them.
2. Do not perform more than one time re-connection to FPC for which repair has been performed.
3. Handle the pulling tool with care since the tip of it is very sharp.
Connector
main body
①
Jan.1.2020 Copyright 2020 HIROSE ELECTRIC CO., LTD. All Rights Reserved.