11/2012
SP 4040
33
SP 4040
5 Maintenance
5.1 General
instructions
All the inspection and maintenance tasks listed here apply to single-shift operation. If the
machine is being operated in multiple shifts it must be checked more frequently.
Warning!
Before undertaking any maintenance or cleaning work on the baling
press or shredder:
• Turn off both main switches and secure against starting accidentally
• Pull out the mains plug for the baling press
Always refer to the "Safety" chapter during maintenance and inspection work.
Among other factors, the operational safety and the longevity of the baling press depend
on properly carried out maintenance.
Since operating conditions may vary, it is impossible to specify in advance how often
wear check, inspections, maintenance and repairs will be necessary. A suitable inspec-
tion routine should be devised according to your particular operating conditions.
Our customer service experts will be glad to assist you with additional advice.
Maintenance work may only be carried out by our specialist engineers or specially
trained staff.
The baling press must undergo a complete overhaul at least every two years.
Before beginning work, always check all cables, pipes and screw connections for leaks,
looseness and visible damage.
Warning!
Correct any damage immediately!
Escaping oil can cause fi re and injury!
Maintenance and repair work on the electrical system or control cabinet
may only be carried out by a qualifi ed electrician or one of our service
engineers!