45
K. UNBALANCED FLUE / VERTICAL VENT
Figure 17
– LP-293-T – Unbalanced Flue/Vertical Vent - NOTE: Drawing is meant to demonstrate system venting
ONLY.
All vent pipes
must be glued, properly supported, and the exhaust must be pitched a minimum of ¼” per foot back
to the boiler to allow drainage of condensate. When placing support brackets on vent piping, the first bracket must
be within 1 foot of the boiler and the balance at 4 foot intervals on the vent pipe. Boiler venting must be readily
accessible for visual inspection for the first three feet from the boiler.
An unbalanced vent system can be installed ONLY when the exhaust is in a vertical position.
Summary of Contents for EL-110
Page 15: ...15 Figure 3 ...
Page 61: ...61 Figure 29 ...
Page 62: ...62 Figure 30 ...
Page 87: ...87 Figure 33 ...
Page 88: ...88 Figure 34 ...
Page 89: ...89 Figure 35 LP 293 A NOTE Parts listed on the following page ...
Page 94: ...94 ...
Page 95: ...95 ...
Page 96: ...96 MAINTENANCE NOTES ...