39
LP-171 Rev. 3.3.15
PART 7 – VENTING, COMBUSTION AIR, AND CONDENSATE REMOVAL
The heater must be vented as detailed in this Venting Section. Ensure exhaust vent and intake piping complies with these instructions
regarding vent system. Inspect finished exhaust vent and intake piping thoroughly to ensure all joints are well secured, airtight, and
comply with all applicable code requirements, as well as with the instructions provided in this manual. Failure to properly install the vent
system will result in property damage, severe personal injury, or death.
A. GENERAL
This heater
is certified as a “Category IV” appliance, and requires a special venting system. The vent system will operate with a positive
pressure in the pipe. Exhaust gases must be piped directly outdoors using the vent materials and rules outlined in these instructions.
Do not connect vent connectors serving appliances vented by natural draft into any portion of mechanical draft systems operating under
positive pressure. Follow the venting instructions below carefully. Failure to do so will result in substantial property damage, severe
personal injury, or death.
1. Installation should be made in accordance with the regulations of the Authority Having Jurisdiction, local code authorities, and utility
companies which pertain to this type of water heating equipment.
2. Install the venting system in accordance with these instructions and with the National Fuel Gas Code, ANSI Z223.1/NFPA 54,
CAN/CGA B149, and/or applicable provisions of local building codes.
3. This water heater must be vented with materials, components, and systems listed and approved for Category IV appliances.
Exhaust vent and intake pipes are to be piped separately. This heater cannot share a common exhaust or intake with multiple
appliances. Failure to follow this instruction will result in substantial property damage, severe personal injury, or death.
NOTE:
To avoid contamination often contained in indoor air, it is best to pipe all intake combustion air directly to the outdoors.
NOTE:
If exhaust vent pipe system passes through an unheated space, such as an alcove or attic, the space must be heated or the
pipe must be insulated. The insulation must have an R value sufficient to prevent freezing of the condensate.
Improper seating of vent pipe gaskets can cause eventual gasket failure and exhaust gas leakage. Ensure the exhaust vent pipe is
properly beveled and seated before insertion into the flue adapter. Failure to do so could result in property damage, severe personal
injury, or death.
Due to the extreme flammability of most glues, cements, solvents, and primers used to join plastic exhaust vent and intake pipes,
explosive solvent vapors must be cleared from all vent piping before start-up. Avoid using excess cement or primer, as this may pool in
the vent pipes. Vent assemblies should be allowed to cure for a period of at least 8 hours before powering a connected appliance.
Failure to follow these instructions will result in substantial property damage, severe personal injury, or death. It is the
installers’
responsibility to understand the hazards associated with explosive solvents and take the necessary precautions to avoid these risks.
Summary of Contents for MC120
Page 21: ...21 LP 171 Rev 3 3 15 M PIPING DETAILS Figure 5 ...
Page 53: ...53 LP 171 Rev 3 3 15 Figure 30 ...
Page 71: ...71 LP 171 Rev 3 3 15 Figure 34 ...
Page 72: ...72 LP 171 Rev 3 3 15 Figure 35 ...
Page 73: ...73 LP 171 Rev 3 3 15 Figure 36 ...
Page 76: ...76 LP 171 Rev 3 3 15 ...
Page 77: ...77 LP 171 Rev 3 3 15 ...