5-57
TRANSMISSION SYSTEM
Front Bridge
INSTALLING THE FRONT BRIDGE PARTS
1. Put the left and right transmission shaft in the
front bridge differential device.
2. Pour 0.32L SAE 80 API GL-4 the high
quality gear grease into the front bridge
differential device and screws tight the oil filler
bolt.
3. Install the front bridge differential device onto
the frame with two pieces of hexagon
boltsM10×110,two pieces of nutsM10 and two
pieces of flat gasket.
Fastening Torque of Conical Nut
23 Nm (2.3m · kg,17 ft · lb)
Fastening Torque of the Bolt
40
~
45 Nm 4.0
~
4.5 m · kg,29
~
33 ft · lb)
Summary of Contents for UTV 700 2009
Page 1: ...HUANSONG UTV 700 SERVICE MANUAL 2009 ...
Page 96: ...GENERAL SPECIFICATIONS 2 23 HYDROGRAPHIC CHART Hydrographic chart Pressure splash ...
Page 97: ...GENERAL SPECIFICATIONS 2 24 LUBRICATION OIL WAY ...
Page 246: ...5 31 BRAKE SYSTEM No Part Name Qty Remarks 26 Caliper piston seal 1 27 Bleed screw 1 ...
Page 330: ...CHARGING SYSTEM 6 18 CHARGING SYSTEM CIRCUIT DIAGRAM Ignition coil C D I Magneto Rectifier ...