5-71
SUSPENSION
Front Suspension and arm
nuts M10.
·
Connect the rear shock absorber and frame with
2 pieces of Hexagon Flange Bolts M10×70 and 2
pieces of self-lock nuts M10.
Note
:
1. Put on the butter to each part when it is
assemble.
2. Do not scratches the surface of the spare
part surface.
To check whether put on the butter before fix, then
fix the upper and lower rockers and L/R front
shock absorber,
etc .
Summary of Contents for UTV 700 2009
Page 1: ...HUANSONG UTV 700 SERVICE MANUAL 2009 ...
Page 96: ...GENERAL SPECIFICATIONS 2 23 HYDROGRAPHIC CHART Hydrographic chart Pressure splash ...
Page 97: ...GENERAL SPECIFICATIONS 2 24 LUBRICATION OIL WAY ...
Page 246: ...5 31 BRAKE SYSTEM No Part Name Qty Remarks 26 Caliper piston seal 1 27 Bleed screw 1 ...
Page 330: ...CHARGING SYSTEM 6 18 CHARGING SYSTEM CIRCUIT DIAGRAM Ignition coil C D I Magneto Rectifier ...