5-97
OIL SYSTEM
Oil Cooling System
INSTALLING OIL COOLING SYSTEM
1. To take a pressure resistance inspection to the
Oil Cooling System after maintain, the pressure is
0.3MPA.
2. After take the pressure resistance inspection,
pass over 0.03MPA compressed air through the
connecting oil cooler, steel oil pipe and Rubber
Pipe for 3 minutes, do not leak.
3. According to the disassembly order, reverse
carries on the assembly.
4. When it is assemblied, pour the" L"
engine oil, then start the engine for 10 minutes to
check whether leaks. If it is not ,the Oil Cooling
System maintain is finish.
Summary of Contents for UTV 700 2009
Page 1: ...HUANSONG UTV 700 SERVICE MANUAL 2009 ...
Page 96: ...GENERAL SPECIFICATIONS 2 23 HYDROGRAPHIC CHART Hydrographic chart Pressure splash ...
Page 97: ...GENERAL SPECIFICATIONS 2 24 LUBRICATION OIL WAY ...
Page 246: ...5 31 BRAKE SYSTEM No Part Name Qty Remarks 26 Caliper piston seal 1 27 Bleed screw 1 ...
Page 330: ...CHARGING SYSTEM 6 18 CHARGING SYSTEM CIRCUIT DIAGRAM Ignition coil C D I Magneto Rectifier ...