UPS5000-E-(40 kVA-320 kVA)
User Manual
3 Installation
Issue 10 (2015-09-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
50
Figure 3-13
Castors off the floor
Step 2
Check whether the bottom of the cabinet is horizontal by using a level. If the cabinet is not
leveled, adjust the leveling feet.
----End
3.2.2 (Optional) Installing Antiseismic Kits
Procedure
Step 1
Determine the positions for installing the antiseismic kits. Mark mounting holes based on the
drawings, as shown in