UPS5000-E-(40 kVA-320 kVA)
User Manual
3 Installation
Issue 10 (2015-09-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
52
Figure 3-15
Securing the antiseismic kits to the cabinet
Step 4
Reinstall the rear panel.
Step 5
Adjust the cabinet position so that the expansion bolt holes are aligned with the six holes at
the bottom of the cabinet.
Step 6
Secure the two antiseismic kits to the floor at the front and rear of the cabinet by using six
M12 expansion bolts, as shown in
Figure 3-16
Securing the antiseismic kits to the floor