UPS5000-E-(40 kVA-320 kVA)
User Manual
3 Installation
Issue 10 (2015-09-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
59
Figure 3-24
Routing power cables through the cable tray covers at the top of the cabinet
(1) Bypass
input PE
(2) Bypass input L1
(3) Bypass
input L2
(4) Bypass input L3
(5) Bypass
input N
(6) Mains input PE
(7) Mains input
L1
(8) Mains input L2
(9) Mains input
L3
(10) Mains input N
(11) Output N
(12) Output W
(13) Output V
(14) Output U
(15) Output PE
(16) Battery input
negative terminal
(17) Battery
input N
(18) Battery input
positive terminal
Drilling holes and routing cables
Based on site requirements such as the number of cables and cable size, you can drill
holes in the large cover in the middle of the cabinet top to accommodate the cables.
shows how to route power cables that are recommended in
UPS5000-E-200K-F200.
Remove the cover before drilling holes. If you choose to route cables by drilling holes, paste grommet
strip to the hole edge to protect cables.