UPS5000-E-(40 kVA-320 kVA)
User Manual
3 Installation
Issue 10 (2015-09-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
55
For details, see the battery installation guide delivered along with the batteries.
Step 2
(Optional) Install a BCB box.
For details, see the
PDC-(0250, 0400, 0630) DC0384BXA BCB Box User Manual
or
PDU8000-(0125, 0250, 0400, 0630, 0800) DCV8-BXA001 BCB Box User Manual
delivered
with the BCB box.
Step 3
(Optional) Install a BBB box.
For details, see the
PDU8000-(0630,1250,2000) DCV8-BGA001 BBB Box User Manual
.
Step 4
(Optional) Install a BMU.
For details, see the
UPS Battery Monitor Unit User Manual
.
Step 5
(Optional) Install a battery grounding failure detector.
Install a battery grounding failure detector, as shown in
UPS5000-E-120K-F120/UPS5000-E-200K-F200),
(for the UPS5000-E-320K-F320T).
Figure 3-19
Position for installing a battery grounding failure detector
(UPS5000-E-200K-F200/UPS5000-E-120K-F120)
(1) Battery grounding failure detector