1. The general input power cable for the smart array controller needs to be prepared by the
customer. Recommended cable: four-core armor cable with the operating voltage to the ground
greater than or equal to 600 V and the cross-sectional area of a single core being 4 mm
2
2. If the SmartLogger communicates with an inverter over an AC power cable, the cable from the
3P3E switch to the fuses and the cable from the busbar to the fuses both need to be prepared
by the customer. Recommended cable: three-core armor cable with the operating voltage to the
ground greater than or equal to 600 V and the cross-sectional area of a single core wire being 4
mm
2
.
3. The SmartLogger and the three RS485 signal surge protective devices (SPDs) used by the
SmartLogger have been installed before delivery.
4. The SmartLogger PGND cable, AC power cable, power adapter and its power cable, and the
communications cable between the SmartLogger and the RS485 signal SPD have been
installed before delivery.
5. The PID module and inductor are configured only in the smart array controller (with a PID
module) and have been installed before delivery.