Figure 4-6
Installing an AAU on a pole top
Step 7
Install AAU cables.
1.
Open the cover for the maintenance cavity of the AAU.
2.
Reconnect cables to the AAU according to the previous record, and ensure that waterproof
blocks are inserted into vacant ports.
3.
Close the cover for the maintenance cavity of the AAU.
Step 8
Set the corresponding circuit breaker on the power equipment for the AAU to ON.
AAU3940
Hardware Maintenance Guide
4 Replacing an AAU
Issue 01 (2015-01-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
14