AP7052DN&AP7152DN
Hardware Installation and Maintenance Guide
2 AP Installation
Issue 01 (2017-12-29)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
24
No.
Check Item
6
The power cables and ground cables are separated from other cables and
bundled separately.
7
Connectors of signal cables are complete, intact, and tightly connected.
The signal cables are not damaged or broken.
8
Labels on cables are clear and correct.
2.10 Powering on the AP
After the AP is powered on, observe the indicator on the AP to check the system running
status. For details, see 1.2 Indicator Description.
Do not frequently power on and off the device.