6
Space Planning
Installation Procedure
(Optional) Installing the Power Module and Lithium Battery on a Wall
10.2
The wall must be made of reinforced concrete and be able to bear at least 800 N. The wall must not be damaged if subject to a tension of
1.25 kN exerted outwards vertical to the wall.
NOTICE
1. Remove wall mounting kits A and B.
Wall mounting
kit A
Wall mounting
kit B
Unit: mm
3. Install the power module
hanging kit.
4. Install a power module.
5. Install the lithium battery hanging kit.
6. Install a lithium battery.
If two lithium
batteries are required,
install one above the
other. Install the pole
mounting kit after
using a positioning
sticker at the cable
hole in the upper part
of the pole to mark its
installation position.
For the method, see
steps 1 and 2.
7. (Optional) Install the second lithium battery.
The option to
install a lithium
battery
depends on
the scenario.
No lithium
battery is
required in the
grid-only
scenario.
NOTE
NOTE