PDC-(0250, 0400, 0630) DC0384BXA Battery Circuit
Breaker Box
Quick Installation Guide
3 Installation
Issue 03 (2019-05-20)
Copyright © Huawei Technologies Co., Ltd.
18
(21) Negative wiring
terminal of BCB box
4 (connecting to
negative terminals
on battery string 4)
(22) BCB box 4
(23) Negative wiring
terminals of the
BBB box
(connecting to
battery negative
input terminals of
the UPS)
(24) Neutral wiring
terminals of the
BBB box
(connecting to
battery neutral input
terminals of the
UPS)
(25) Positive wiring
terminals of the
BBB box
(connecting to
battery positive
input terminals of
the UPS)
Step 4
Check that the cables are connected correctly and securely.
----End
3.4.3 Installing a Signal Cable
When connecting cables, ensure that dry contacts OL, STA, DRV, and 0V on the UPS dry
contact card correspond to control signal ports OL, STA, DRV, and GND on the BCB box
respectively.
If the cable length is insufficient, prepare the signal cable onsite. To ensure that the cable
sequence is correct, you are advised to attach labels to the cable. Ensure that the signal
cable is no longer than 50 m.
Single Battery String
Step 1
Connect a signal cable between the BIB and the MUE05A.