5
Preparations
Preparing the Construction Environment
No.
Item
Method
1
Site selection
• Select a site that is free of high temperatures, heavy dust, harmful gas, inflammable or
explosive materials, low air pressure, great shock, or sharp noise.
• Ensure that the site location (such as a wall) meets the bearing capacity requirement of
the product.
2
Others
Associated devices (such as the battery and UPS), fibers, two-core cables, and screws
are available.