EDGE U0-6 Simplified Maintenance Manual
11 Quality Inspection Procedure and Methods
Issue 1.0 (2013-01-12)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
65
11
Quality Inspection Procedure and
Methods
After the maintenance, check the phone's basic functions. Perform the quality inspection
according to the flowchart in section 11.1 "Inspection Flowchart" to ensure that there are no
potential faults. So far, the MMI test, current test, charging test, and MT are used for the
quality inspection.
11.1 Inspection Flowchart
Figure 11-1
Inspection flowchart
Maintenance
MMI test
Battery
functionality test
Current test
MT
Charging test
End
Table 11-1
Inspection description
Item
Description
Reference Value
Battery test
Test the battery voltage using a multimeter.
0 V < X < 4.5 V
Connect the phone to a power adapter, charge the
phone for 15 minutes, and test the voltage rise of the
battery. (Ensure that the battery voltage is lower than
3.5 V before charging it.)
> 0.5 V
Current test
Test the power-off current.
0 mA
Test the power-on peak current.
< 600 mA