8
4
Verifying the Installation
(1) Wiring terminal block
(2) Switches
(3) Cabinet bottom
4. If the battery cabinet does not need to be powered on immediately, it is recommended that the
battery cabinet be sealed after installation (before power-on) with baffle plates or plastic bags to
prevent dust on the top of the battery cabinet or inside the battery cabinet.
1. Check that there is no foreign matter in the cabinet.
2. After verifying the installation, reinstall all the covers.
3. In the scenarios where holes are drilled for routing cables or covers are removed for routing
cables, after routing cables and checking cable connections, use firestop putty to fill in the gap
between the cables and the cabinet.
Firestop putty