ETP48400-C9A2 Embedded Power
User Manual
4 Installation
Issue 05 (2020-04-07)
Copyright © Huawei Technologies Co., Ltd.
29
When routing power cables, ensure that there is no coiling or twisting. Do not join or
weld power cables. If necessary, use a longer cable.
4.1.4 Rules for Removing a Protective Panel
When installing a subrack in a cabinet, remove the entire protective panel.
When installing a subrack in an open subrack, tailor the protective panel based on the
cross-sectional area of the cable bundle for routing cables.
Figure 4-2
Tailoring a protective panel
(1) Protective panel