ETP48400-C9A2 Embedded Power
User Manual
7 Maintenance
Issue 05 (2020-04-07)
Copyright © Huawei Technologies Co., Ltd.
70
Procedure
Step 1
Push the locking latch towards the left.
Step 2
Pull the handle outwards and remove the SMU, as shown in
Figure 7-3
Removing an SMU
Step 3
Insert the new SMU into the subrack, push the locking latch towards the left, and pull out the
handle.
Step 4
Slide the SMU into the subrack slowly along the guide rails, push in the handle, and then push
the locking latch towards the right.
Step 5
Reset the parameters on the SMU.
Figure 7-4
Installing an SMU
----End
Follow-up Procedure
Pack the removed component and send it to the local Huawei warehouse.
7.4.3 Replacing the PCB of UIM02C
Prerequisites
You have obtained an ESD wrist strap, a pair of ESD gloves, an ESD box or bag, the
cabinet door key, and tools.
The new printed circuit board (PCB) of UIM02C is intact.
Procedure
Step 1
Connect the ground cable to the ESD wrist strap, and wear the ESD wrist strap and ESD
gloves.