8
4 Installing the Cabinet on a Concrete Pedestal
Plan space for the concrete pedestal
F01T500 cabinet
Unit: mm
Ground
14mm Rebar
Top view
Cable area for power cable, optical
cable(Upstream), and PGND cable
Cable area for subscriber cable or optical cable
(Downstream)
Inner installation hole
Outer installation hole
According to the actual requirements, install the cabinet with the outer installation holes or the inner installation holes.
Square holes must be reserved on the concrete ground for easy cable routing.
4.1 Construct the Concrete Pedestal
Summary of Contents for F01T500
Page 1: ...HUAWEI TECHNOLOGIES CO LTD F01T500 Quick Installation Guide Issue 07 Date 2017 05 03 ...
Page 19: ...With battery cabinet 4 Installing the Cabinet on a Concrete Pedestal 14 ...
Page 23: ...18 Unit mm 4 Installing the Cabinet on a Concrete Pedestal ...
Page 25: ...20 4 Installing the Cabinet on a Concrete Pedestal ...
Page 27: ...22 4 Installing the Cabinet on a Concrete Pedestal ...
Page 38: ...33 With power meter box ...
Page 40: ...35 With power meter box AC power cables AC power cables ...
Page 44: ...39 6 Routing Cables 6 3 Diagram of Cable Connections Between the RPS and MDF RPS Power Supply ...
Page 51: ...46 Route the input Cables of the AC RPR power supply 6 Routing Cables ...
Page 83: ...14 FAQs for Installation 78 ...
Page 84: ...15 FAQs for Installation 79 ...