12
4.2 Fastening the Cabinet
F01T500 cabinet
Bearing capacity of the steel rope
> 750kg
Fastening the Cabinet with the Outer Installation
Cover of the installation foot
Spacers (optional)
•
When fastening the cabinet, after you cover the cover of the installation foot, you must seal the installation foot with the
transparent or white silica gel.
•
Construct the protection fence after installing the cabinet.
•
Plan the coverage of the protection fence based on the ground plan to ensure that all doors of the cabinet can be opened
without difficulties.
•
The accessories of a battery compartment include 3 types of spacers. These 3 types of spacers have different
thicknesses. Select a proper spacer based on the live-network environment so that the cabinet bottom is level.
4 Installing the Cabinet on a Concrete Pedestal
Summary of Contents for F01T500
Page 1: ...HUAWEI TECHNOLOGIES CO LTD F01T500 Quick Installation Guide Issue 07 Date 2017 05 03 ...
Page 19: ...With battery cabinet 4 Installing the Cabinet on a Concrete Pedestal 14 ...
Page 23: ...18 Unit mm 4 Installing the Cabinet on a Concrete Pedestal ...
Page 25: ...20 4 Installing the Cabinet on a Concrete Pedestal ...
Page 27: ...22 4 Installing the Cabinet on a Concrete Pedestal ...
Page 38: ...33 With power meter box ...
Page 40: ...35 With power meter box AC power cables AC power cables ...
Page 44: ...39 6 Routing Cables 6 3 Diagram of Cable Connections Between the RPS and MDF RPS Power Supply ...
Page 51: ...46 Route the input Cables of the AC RPR power supply 6 Routing Cables ...
Page 83: ...14 FAQs for Installation 78 ...
Page 84: ...15 FAQs for Installation 79 ...