Updates in Issue 01 (2015-03-21)
This is the first release.
Updates in Issue 05 (2016-09-01)
Based on issue 04 (2016-05-30), this document is updated as follows :
Added the description of installing a power meter box for a cabinet .
Added the description of installing a cabinet on an underground base.
Updates in Issue 04 (2016-05-30)
Based on issue 03 (2016-01-14), this document is updated as follows:
Optimized the picture for installing the temporary RPC.
Updates in Issue 03 (2016-01-14)
Based on issue 02 (2015-08-10), this document is updated as follows :
Optimized the layout of the chapters.
Added the operation of the cable sealing bags.
Updates in Issue 02 (2015-08-10)
Based on issue 01 (2015-03-21), this document is updated as follows:
Modified the dimensions of the cabinet bottom.
Added the installation procedure of the temporary RPC.
Added the installation procedure of the battery monitor system.
Installing the Electronic Door Lock System.
Updates in Issue 06 (2017-03-01)
Based on issue 05 (2016-09-01), this document is updated as follows:
Added the AC+RPR power supply.
Summary of Contents for F01T500
Page 1: ...HUAWEI TECHNOLOGIES CO LTD F01T500 Quick Installation Guide Issue 07 Date 2017 05 03 ...
Page 19: ...With battery cabinet 4 Installing the Cabinet on a Concrete Pedestal 14 ...
Page 23: ...18 Unit mm 4 Installing the Cabinet on a Concrete Pedestal ...
Page 25: ...20 4 Installing the Cabinet on a Concrete Pedestal ...
Page 27: ...22 4 Installing the Cabinet on a Concrete Pedestal ...
Page 38: ...33 With power meter box ...
Page 40: ...35 With power meter box AC power cables AC power cables ...
Page 44: ...39 6 Routing Cables 6 3 Diagram of Cable Connections Between the RPS and MDF RPS Power Supply ...
Page 51: ...46 Route the input Cables of the AC RPR power supply 6 Routing Cables ...
Page 83: ...14 FAQs for Installation 78 ...
Page 84: ...15 FAQs for Installation 79 ...