30
•
Seal the gap between the power meter box and the cabinet, and seal the cable holes of the cabinet to prevent vapor from
entering the cabinet.
•
See the meter manual to connect a power meter.
With power meter box
Remove the mechanical part from the
cable aperture.
Remove the plastic fillers from the side panel of the
cabinet, install the supports of the cable trough.
Install the lower part of the cable trough.
Install the upper part of the cable trough.
Plastic fillers
Cable trough support
Summary of Contents for F01T500
Page 1: ...HUAWEI TECHNOLOGIES CO LTD F01T500 Quick Installation Guide Issue 07 Date 2017 05 03 ...
Page 19: ...With battery cabinet 4 Installing the Cabinet on a Concrete Pedestal 14 ...
Page 23: ...18 Unit mm 4 Installing the Cabinet on a Concrete Pedestal ...
Page 25: ...20 4 Installing the Cabinet on a Concrete Pedestal ...
Page 27: ...22 4 Installing the Cabinet on a Concrete Pedestal ...
Page 38: ...33 With power meter box ...
Page 40: ...35 With power meter box AC power cables AC power cables ...
Page 44: ...39 6 Routing Cables 6 3 Diagram of Cable Connections Between the RPS and MDF RPS Power Supply ...
Page 51: ...46 Route the input Cables of the AC RPR power supply 6 Routing Cables ...
Page 83: ...14 FAQs for Installation 78 ...
Page 84: ...15 FAQs for Installation 79 ...