About This Document
Purpose
This document describes the site requirements and preparations for installing the
FusionDC1000A prefabricated all-in-one data center (FusionDC1000 for short) as
well as the methods and skills required for installing the pre-fab. module, devices,
pipes, and cables, providing installation guidance and technical support for onsite
installation personnel and technical support engineers.
Intended Audience
This document is intended for:
●
Hardware installation engineers
●
Technical support engineers
●
Commissioning engineers
●
Maintenance engineers
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol
Description
Indicates a hazard with a high level of risk which, if not
avoided, will result in death or serious injury.
Indicates a hazard with a medium level of risk which, if not
avoided, could result in death or serious injury.
Indicates a hazard with a low level of risk which, if not
avoided, could result in minor or moderate injury.
Indicates a potentially hazardous situation which, if not
avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to personal
injury.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
About This Document
Issue 01 (2021-04-20)
Copyright © Huawei Technologies Co., Ltd.
ii