Figure 6-1 Opening the compartment door of the smart cooling product on the
right
Step 3 Install the pipes.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
6 Installing External Pipes for Smart Cooling
Products
Issue 01 (2021-04-20)
Copyright © Huawei Technologies Co., Ltd.
58