Figure 8-5 Installing copper bars and cables
Step 7 Reinstall the BCU.
Figure 8-6 Installing the BCU
----End
8.2 (Optional) Installing the Electric Heating Belt
Preparations
Tools: None
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
8 Installing Devices Inside the Pre-fab. Module
Issue 01 (2021-04-20)
Copyright © Huawei Technologies Co., Ltd.
72